Using the FDE Toolbox to Build a New Agent Project
A nine-step method for starting a new Agent project with the FDE toolbox: define a small but complete business loop first, declare the capability mix in a Scenario, finish a deterministic baseline, and only then verify with a real model.

The core idea: first define a small but complete business loop, then compose capabilities from the toolbox, and finally verify with a real model — rather than building a complete platform from the start.
1. Clarify the project goal
Answer three questions first:
- What business problem should the Agent solve?
- What are the input materials?
- What is the final deliverable?
For example, in this project:
Given the project brief, weekly reports, meeting minutes, and risk register, generate project status cards with evidence sources.
Also make the boundaries explicit:
- Read local materials only?
- Internet access allowed?
- File writes allowed?
- Human confirmation required?
- Real external systems needed?
2. Create a separate project directory
Each new project gets its own subfolder, so the shared Runtime is not polluted:
project-name/
├── scenario.json
├── demo-request.md
├── materials/
├── runtime/
└── README.md
Where:
scenario.json: declares which capabilities the project needs;demo-request.md: a simulated user task;materials/: simulated or real business materials;runtime/: run reports and temporary results;README.md: how to run it, and the project boundaries.
This project can serve as a template reference: project-review-agent.
3. Prepare test materials with business value
Do not write just one simple description. The materials should at least include:
- Project background and goals;
- Current progress;
- Metric data;
- Risks and issues;
- Meeting minutes;
- Acceptance checklist;
- Deadlines and owners;
- Conflicting or missing information.
Only then can you test whether the Agent can:
- Distinguish facts, judgments, and items pending confirmation;
- Spot conflicts between different files;
- Handle times and metrics;
- Give conclusions with grounds;
- Avoid writing inferences as facts.
4. Write the Scenario composition declaration
In scenario.json, declare:
- Runtime type;
- Pack;
- Skill;
- Tools;
- Shared Capability;
- Required inputs;
- Model round limits.
This time, the mix used was:
- Tools:
vfs_glob,vfs_read,file_search,calculator; - Work tools:
knowledge_work_plan, evidence checking, quality gate; - Pack:
evidence-driven-knowledge-work; - Skill: planning and evidence handling;
- Shared Capability: evidence contract and run governance.
Reference: scenario.json.
Note: a Scenario only declares scope; it does not automatically grant permission. Whether something actually executes still goes through authorization and governance.
5. Finish the deterministic baseline first
In the first round, do not rush to connect a real model. Verify first:
- Can the Scenario be assembled?
- Do the tools execute?
- Are tool parameters correct?
- Is evidence traceable?
- Does the quality gate take effect?
- Are write tools correctly restricted?
The point of this step is a baseline that separates:
- Problems in the tools themselves;
- Problems in the orchestration logic;
- Problems in the model.
6. Enrich the test scenarios and run a second verification round
The second round focuses on complex situations from real business:
- Dates inconsistent across materials;
- Weekly reports out of sync with the risk register;
- Metric definitions not yet confirmed;
- Key materials missing;
- Tools returning empty results;
- Tool calls failing;
- Some tasks requiring human confirmation;
- Conclusions required to cite sources.
At this point, check both the machine report and the human-readable report — do not look at the JSON only.
7. Connect a real LLM
When connecting a real model, verify in layers:
- Task understanding;
- Tool selection;
- Tool parameter generation;
- Tool execution;
- Final answer generation;
- Judge review.
The model may only propose tool calls; it cannot directly decide whether a tool call is allowed to execute.
This time, what was finally used came from the consulting project:
- DashScope;
qwen3.7-plus;- Tool Calling;
- The remote configuration and key were read only inside the process, not copied into this project.
Run report: real-ollama-report.md.
8. Establish acceptability criteria
A demo counts as done only if at least the following check out:
- The goal was achieved;
- The tools were actually called;
- Tool results made it into the final answer;
- Important conclusions have evidence;
- Facts and judgments are distinguished;
- Failures and uncertainty are handled correctly;
- No unauthorized writes happened;
- Real-model and Fake-Model results are recorded separately;
- A human has read it.
9. Then decide whether to productionize
After the demo passes, add gradually:
- Persistent tasks;
- Checkpoint and recovery;
- Human approval;
- Artifact management;
- Real business-system connections;
- RAG indexing;
- Automated evaluation sets;
- Permissions, quotas, and audit;
- A front-end workbench.
So the full method can be summarized as:
Define the business loop → create the project directory → prepare complex materials → declare the Scenario → compose tools and capabilities → finish the deterministic baseline → connect a real LLM → evaluate the results → then productionize.